Home » Projets » 1999 ELGIN FRANKLIN

1999 ELGIN FRANKLIN

Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.

Location : NORTH SEA / Elgin – Franklin Shearwater Fields
Client : ELF EXPLORATION UK / COFLEXIP STENA OFFSHORE

Length (km): 13,9
Water depth (m) : 92
Vessel : DP Vessel
Burial system : CASTOR 2 : Mechanical Trencher
BD (m) : 0,75 to 0,9
Product : Composite
Weight (kg/m) : 18,1 / 39,7
Diameter : 99 / 139 mm

Other projects

  • 1998-1999 VNF PARIS

    Along river / Laying and burial of 3 multiple FO cables laid in one go
    Burial system : ESV 07 / ESV11 (Plough)
    Plus d’infos
  • 2022 GRACE HOPPER

    Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher
    Burial system :
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos