Home » Projets » 2003 ILE D’YEU

2003 ILE D’YEU

Mainland to island / Shore ends / Laying and burial of 20 kV pc

Location : FRANCE – ILE D’YEU/SAINT JEAN DE MONTS
Client : NEXANS

Length (km): 18
Water depth (m) : 8
Vessel : Barge
Burial system : N.A.
Burial depth (m) : 1,8
Product : Power Cable
Weight (kg/m) : 28
Diameter : 111 mm

Other projects

  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2023 BLUE BASTIA

    1 x Direct landing in Bastia, shell installation, post-burial, anchor installation with posidonies
    Burial system :
    Plus d’infos