Mainland to island / Shore ends / Laying and burial of 20 kV pc

Location : FRANCE – ILE D’YEU/SAINT JEAN DE MONTS
Client : NEXANS

Length (km): 18
Water depth (m) : 8
Vessel : Barge
Burial system : N.A.
Burial depth (m) : 1,8
Product : Power Cable
Weight (kg/m) : 28
Diameter : 111 mm

Other projects

  • 1996 THAILANDE

    Mainland to KO SAMUI Island /Laying and burial of 115 kV power cable
    Burial system : TM02 (Trencher) – TJV04 (Jetting)
    Plus d’infos
  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)
    Plus d’infos
  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)