Home » Projets » 2005 FALCON

2005 FALCON

Separate shore ends / Laying and burial of FO cable

Location : Dubaï -Qatar – Barhain – Iran – Saudi – Yemen
Client : Alcatel Submarine Networks

Length (km): 228
Water depth (m) : 12
Vessel : Barge
Burial system : TJV05 – EBJ03 (Jetting)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 4
Diameter : 35,9 mm

Other projects

  • 2024 REVOLUTION WIND

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2014 PERENCO RDC CONGO

    Laying of 43 km of power cable between mainland / platforms and platforms.
    Burial system : ROVJET806 + EBJ (jetting)
    Plus d’infos
  • 2023 2 AFRICA SOUTH AFRICA

    1 x Direct landing in Port Elizabeth, shell installation, post beaching, clamp installation. Installation of grounding system
    Burial system :
    Plus d’infos