Home » Projets » 2011 KASHAGAN

2011 KASHAGAN

Provison of burial services for 4 power and FO cables and 6 umbilicals.
Location : Kashagan oil field – Kazakhstan
Client : SONSUB (for SAIPEM)
Length (km): 41
Water depth (m) : 4
Vessel : Barge
Burial system : TM03 (Trencher) + ESV12 (Plough)
Burial depth (m) : 2
Product : FO cable / Power cable
Weight (kg/m) : max 30.8 
Diameter : max 171 mm

Other projects

  • 2001 SAT 3

    DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
    Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
    Plus d’infos
  • 2000 VNF LILLE

    Along river – canal / 1 telecommunication fibre optic cable.
    Burial system : Machine LD CABLE : Towed plough
    Plus d’infos
  • 1999 ELGIN FRANKLIN

    Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.
    Burial system : CASTOR 2 (Trencher)
    Plus d’infos