Home » Projets » 2011 KASHAGAN

2011 KASHAGAN

Provison of burial services for 4 power and FO cables and 6 umbilicals.
Location : Kashagan oil field – Kazakhstan
Client : SONSUB (for SAIPEM)
Length (km): 41
Water depth (m) : 4
Vessel : Barge
Burial system : TM03 (Trencher) + ESV12 (Plough)
Burial depth (m) : 2
Product : FO cable / Power cable
Weight (kg/m) : max 30.8 
Diameter : max 171 mm

Other projects

  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2001 CROSSING TAT 14

    PLIB works on telecom FO cable crossings with RTE / NGC power cables
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos