2013 VISCAS SIR BANYAS

Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)

Location : Sir Banyas Island (UAE)
Client : VISCAS
Length (km): 2 x 13
Water depth  (m) : 0 to 35
Vessel : Barge
Burial system : TM04 (trencher)
Burial Depth (m) : 1
Product : power cable + FO cable
Weight (kg/m) : 55
Diameter : 226 mm

Other projects

  • 2015 SEA LION Rostock

    1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
    Burial system : ROVJET404 + EBJ (jetting)
    Plus d’infos
  • 2012 CAT – THAÏLAND

    2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.
    Burial system : EBJ 04 + ESV12 (jetting)
    Plus d’infos
  • 2015 ABU ALI

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM03 (trenching)
    Plus d’infos