Home » Projets » 2013 VISCAS SIR BANYAS

2013 VISCAS SIR BANYAS

Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)

Location : Sir Banyas Island (UAE)
Client : VISCAS
Length (km): 2 x 13
Water depth  (m) : 0 to 35
Vessel : Barge
Burial system : TM04 (trencher)
Burial Depth (m) : 1
Product : power cable + FO cable
Weight (kg/m) : 55
Diameter : 226 mm

Other projects

  • 2001 ANTARES

    Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).
    Burial system : N.A.
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos