2013 VISCAS SIR BANYAS

Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)

Location : Sir Banyas Island (UAE)
Client : VISCAS
Length (km): 2 x 13
Water depth  (m) : 0 to 35
Vessel : Barge
Burial system : TM04 (trencher)
Burial Depth (m) : 1
Product : power cable + FO cable
Weight (kg/m) : 55
Diameter : 226 mm