2020 Dunant

Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.

Location : Saint Hilaire de Riez / France
Client : Subcom

Product : Fibre optic cable 
Length (km): 5
Water depth (m) : up to 15 m
Vessel : DP Vessel
Burial system : TO Mobile NV (jetting)
Burial depth (m) : 1 

Other projects

  • 2025 CSN-1 COLOMBIA

    Separate landing in Barranquilla. Laying and post-wiring of 8.5 km of fiber optic cable, Installation of grounding system
    Burial system :
    Plus d’infos
  • 1996 THAILANDE

    KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable
    Burial system : TM02 (Trencher) – TJV04 (Jetting)
    Plus d’infos
  • 2026 Lumalink

    Mobilization of the DP barge in Panama, followed by towed transit to Cayenne (French Guiana). Separate shore-end landing, simultaneous laying and burial of 15 km of fiber optic cable.
    Burial system :