Home » Projets » 1996 THAILANDE

1996 THAILANDE

KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable

Location : THAILAND / KO PHANGAN island to KOH SAMUI island
Client : ALCATEL / PEA

Length (km): 14,6
Water depth (m) : 20
Vessel : Barge
Burial system : TM02 (Trencher) – TJV04 (Jetting)
BD (m) : 1
Product : Power cable
Weight (kg/m) : 32
Diameter : 112 mm

Other projects

  • 2025 PEARLS CABLE STORAGE

    Storage of fiber optic cable and repeaters in Bahrain
    Burial system :
    Plus d’infos
  • 2006 THAILAND KHO SAMUI

    Shore ends/Mainland to island/Laying and burial of 115 kV power cable
    Burial system : TJV05 – TJV08 (Jetting)
    Plus d’infos
  • 2024 DOGGER BANK B

    Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.
    Burial system :
    Plus d’infos