2000 Dumpton Gap – Level 3

Remedial work : Lay and simultaneous burial of fibre optic cable.

Location : ENGLISH CHANNEL
Client : Offshore DUMPTON GAP LEVEL 3 FO cable system (ALCATEL SUBMARINE NETWORKS)

Length (km): 5,4
Water depth (m) : 25
Vessel : Barge
Burial system : ESV11 (Plough)
Burial depth (m) : 1,4
Product : Fibre optic cable
Weight (kg/m) : 5,4
Diameter : 46 mm

Other projects

  • 2017 BEATRICE OWF

    Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2018 IFA 2000 CABLES REPAIR

    Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.
    Burial system : ROVJET 605 (jetting) + Massflow
    Plus d’infos
  • 2000 VNF LILLE

    Along river – canal / 1 telecommunication fibre optic cable.
    Burial system : Machine LD CABLE : Towed plough
    Plus d’infos