Remedial work : Lay and simultaneous burial of fibre optic cable.

Location : ENGLISH CHANNEL
Client : Offshore DUMPTON GAP LEVEL 3 FO cable system (ALCATEL SUBMARINE NETWORKS)

Length (km): 5,4
Water depth (m) : 25
Vessel : Barge
Burial system : ESV11 (Plough)
Burial depth (m) : 1,4
Product : Fibre optic cable
Weight (kg/m) : 5,4
Diameter : 46 mm

Other projects

  • 2001 CROSSING TAT 14

    PLIB works on telecom FO cable crossings with RTE / NGC power cables
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos
  • 2012 THORNTON BANK

    Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
    Burial system : ROVJET605 + ROVJET806 (jetting)