2000 PEC / LEVEL 3/ FLUTE

PLIB works on telecom fibre optic cable crossings.

Location : ENGLISH CHANNEL (Manche)
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 13,8
Water depth (m) : 56
Vessel : DP Vessel
Burial system : MED 1: Dredge pump / jetting tool
Burial depth (m) : 0,8-1,2
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 41 mm

Other projects

  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2016 BBG FUJAIRAH

    1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes)
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2011 ORMONDE WINDFARM

    Post Lay Inspection and Burial of 32 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos