PLIB works on telecom fibre optic cable crossings.

Location : ENGLISH CHANNEL (Manche)
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 13,8
Water depth (m) : 56
Vessel : DP Vessel
Burial system : MED 1: Dredge pump / jetting tool
Burial depth (m) : 0,8-1,2
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 41 mm

Other projects

  • 2004 SIMIAN SAPHIRE

    Provision of nearshore trenching services.
    Burial system : TJV06 (Jetting)
    Plus d’infos
  • 2003 IFA 2000 – CABLE 11 REPAIR

    500 MW HVDC Power cable repair.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2011 ACE – SENEGAL

    2 direct FO shore-ends in Dakar (Senegal). Protection of cable (burial, articulated pipes, grout bags)
    Burial system : EBJ (Jetting)