Home » Projets » 2000 PEC / LEVEL 3/ FLUTE

2000 PEC / LEVEL 3/ FLUTE

PLIB works on telecom fibre optic cable crossings.

Location : ENGLISH CHANNEL (Manche)
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 13,8
Water depth (m) : 56
Vessel : DP Vessel
Burial system : MED 1: Dredge pump / jetting tool
Burial depth (m) : 0,8-1,2
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 41 mm

Other projects

  • 2022 2 AFRICA & BLUE

    Pre Lay Grapnel Run (PLGR) & Route Clearance (RC) for the BLUE and 2Africa projects in the Mediterranean Sea
    Burial system :
    Plus d’infos
  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2005 SEA-ME-WE 4

    Direct shore ends / Laying and burial of FO cable
    Burial system : Dredge pump (with divers)
    Plus d’infos