Home » Projets » 2016 NORDSEE ONE

2016 NORDSEE ONE

Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.

Location : Nordsee One  Windfarm / North Sea (German waters)
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 62
Water depth (m) : up to 29 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5

Other projects

  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)
    Plus d’infos
  • 2021 HORNSEA 2

    Provision of personnel and equipment to carry out the post lay burial of infield array cables.
    Burial system :
    Plus d’infos
  • 2022 HORNSEA 2

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos