Home » Projets » 2016 NORDSEE ONE

2016 NORDSEE ONE

Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.

Location : Nordsee One  Windfarm / North Sea (German waters)
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 62
Water depth (m) : up to 29 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :
    Plus d’infos
  • 2013 ANHOLT

    Post Lay Inspection and Burial of 111 infield power cables
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2018 TRIANEL BORKUM II OWF

    Provision of personnel and equipment to carry out the post lay burial of 18 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos