Home » Projets » 2020 TANNAT and MALBEC Systems

2020 TANNAT and MALBEC Systems

Pre Lay Grapnel Run and Route Clearance to a depth of 1,500 m in May.

Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina).

Installation of shells.

Location: Las Toninas (Argentina)

Client: Alcatel Submarine Networks (ASN)

Product: Optical fiber

Length: 2 x 7 km

Depth: 15 m

Ship: DP

Burial system: ROVJET 404

Burial depth: 1.5 m

Period: November

Other projects

  • 2023 HKZ Project

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2005 SEA-ME-WE 4

    Direct shore ends / Laying and burial of FO cable
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos