Home » Projets » 2022 2 AFRICA & BLUE

2022 2 AFRICA & BLUE

Pre Lay Grapnel Run (PLGR) & Route Clearance (RC) for the BLUE and 2Africa projects in the Mediterranean Sea

Location: Marseille France, Digue du large
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): N/A
Water depth (m) :
Vessel: N/A
Trenching system: N/A
Trenching depth (m): N/A
Product:
cable type:

Other projects

  • 2004 SIR BANIYAS

    Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2009 KASHAGAN

    Provison of burial services for 1 power cable and 2 umbilicals.
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos