Home » Projets » 2023 ANGOLA

2023 ANGOLA

Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable

Location: Luanda Angola
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2015 SEA LION Rostock

    1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
    Burial system : ROVJET404 + EBJ (jetting)
    Plus d’infos
  • 2018 INDIGO

    Post lay inspection and burial of 39 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)
    Plus d’infos
  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos