Home » Projets » 2023 CONGO

2023 CONGO

Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable

Location: Pointe Noire – CONGO
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos
  • 2011 DELMA REPAIR

    Provision of submarine power cable repair assistance.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos