2024 MORAY WEST

Assistance to laying

Location: Taiwan
Customer: SEAWAY 7

Length (km): n/A
Water depth (m) :
Vessel: Seaway Phoenix
Beaching system: RN/A
Beaching depth (m): N/A
Product : Power cable
cable type: ø

Other projects

  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2001 CROSSING TAT 14

    PLIB works on telecom FO cable crossings with RTE / NGC power cables
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos