Home » Projets » 2014 WINTERSHALL

2014 WINTERSHALL

Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.

Location : Dutch sector of North Sea
Client : VBMS

Product : Umbilical
Length (km): 19
Water depth (m) : 30 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1
Weight (kg/m) : –
Diameter : 

Other projects

  • 2003 IFA 2000 – CABLE 11 REPAIR

    500 MW HVDC Power cable repair.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2024 NIGERIA

    Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water
    Burial system :
    Plus d’infos
  • 2023 ANGOLA

    Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable
    Burial system :
    Plus d’infos