Home » Projets » 2015 QUIBERON BELLE ISLE 4

2015 QUIBERON BELLE ISLE 4

Laying of 14.5 km of hybrid cable between Quiberon (mainland) and Belle Isle.
Location : Quiberon – Belle Isle  (Brittany)
Client : ERDF
Length (km): 14.5
Water depth (m) : 0 to 25
Vessel : DP vessel
Burial system : N.A.
Burial depth (m) : N.A.
Product : Hybrid Cable (Power + FO)
Weight (kg/m) : 29
Diameter : 122 mm

Other projects

  • 2015 ABU ALI

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2021 HORNSEA 2

    Provision of personnel and equipment to carry out the post lay burial of infield array cables.
    Burial system :
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos