Home » Projets » 2015 QUIBERON BELLE ISLE 4

2015 QUIBERON BELLE ISLE 4

Laying of 14.5 km of hybrid cable between Quiberon (mainland) and Belle Isle.
Location : Quiberon – Belle Isle  (Brittany)
Client : ERDF
Length (km): 14.5
Water depth (m) : 0 to 25
Vessel : DP vessel
Burial system : N.A.
Burial depth (m) : N.A.
Product : Hybrid Cable (Power + FO)
Weight (kg/m) : 29
Diameter : 122 mm