Home » Projets » 2015 ILE D’YEU

2015 ILE D’YEU

Surface laying of 2 sections of power cable YEU3 and YEU4.

Location : Ile d’Yeu / France
Client : ERDF

Product : power cable 
Length (km): 1.8 + 3
Water depth (m) : up to 10 m
Vessel : N.A.
Burial system : N.A.
Burial depth (m) : N.A.
Weight (kg/m) : 19
Diameter (mm): 93

Other projects

  • 2016 NORDSEE ONE

    Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos
  • 2014 WINTERSHALL

    Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos