Surface laying of 2 sections of power cable YEU3 and YEU4.

Location : Ile d’Yeu / France
Client : ERDF

Product : power cable 
Length (km): 1.8 + 3
Water depth (m) : up to 10 m
Vessel : N.A.
Burial system : N.A.
Burial depth (m) : N.A.
Weight (kg/m) : 19
Diameter (mm): 93