2014 WINTERSHALL

Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.

Location : Dutch sector of North Sea
Client : VBMS

Product : Umbilical
Length (km): 19
Water depth (m) : 30 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1
Weight (kg/m) : –
Diameter : 

Other projects

  • 2017 LTAII

    Provision of personnel and equipment to carry out trebsching services on a total of 10 submarine power cables.
    Burial system : TM03 + TM04 (trenchers)
    Plus d’infos
  • 2012 THORNTON BANK

    Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
    Burial system : ROVJET605 + ROVJET806 (jetting)
    Plus d’infos
  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos