2001 SAT 3
DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
A SUBSIDIARY OF THE LD ARMATEURS GROUP
DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
Cable lay and burial BUDE shore end (UK).
Along river – canal / 1 telecommunication fibre optic cable.
PLIB works on telecom fibre optic cable crossings.
Remedial work : Lay and simultaneous burial of fibre optic cable.
3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.
Cable deburial / reburial and cable loop burial on CIRCE fibre optic cable system.
Along river / Laying and burial of 3 multiple FO cables laid in one go
Along river – canal / Dual fibre optic cable.
Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable

Contact us to find out more!