2016 FITZROY Darwin
1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.
A SUBSIDIARY OF THE LD ARMATEURS GROUP
1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.
1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes)
1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.
Provison of burial services for 4 power and FO cables and 6 umbilicals.
FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS

Contact us to find out more!