2008 DELMA
Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
A SUBSIDIARY OF THE LD ARMATEURS GROUP
Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
Shore ends/Mainland to island/Laying and burial of 115 kV power cable
Mainland to platforms. Surface lay + J-tube Pull-In
Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)
500 MW HVDC Power cable repair.
Laying and burial of 40 km of power cable in Saudi Arabia.
Mainland to island / Shore ends / Laying and burial of 20 kV pc
Power and composite cables inside miltary harbour.
Main land to island / 34.5 kV power extension.
Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable

Contact us to find out more!