2023 2 AFRICA SOUTH AFRICA
1 x Direct landing in Port Elizabeth, shell installation, post beaching, clamp installation. Installation of grounding system
A SUBSIDIARY OF THE LD ARMATEURS GROUP
1 x Direct landing in Port Elizabeth, shell installation, post beaching, clamp installation. Installation of grounding system
1 x Direct landing in Palermo, shell installation, post-burial. Installing the grounding system
1 x Direct landing at Sesimbra, shell installation and post-burial.
Pre Lay Grapnel Run (PLGR) & Route Clearance (RC) for the BLUE and 2Africa projects in the Mediterranean Sea
1 x Direct landing at Duynfontein, shell installation and post-burial. Installation of grounding system
Separate landing in Barranquilla. Laying and post-wiring of 8.5 km of fiber optic cable, Installation of grounding system
1 x Direct landing in Bastia, shell installation, post-burial, anchor installation with posidonies
2 x Direct landing in Marseilles. Shell installation
1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
2 x Direct landings at Genoa in a directional borehole. Shell installation

Contact us to find out more!