2023 GHANA 2
Recovery and replacement of damaged Ace cable in Accra. Laying and post-wiring of 5 km of fiber optic cable
A SUBSIDIARY OF THE LD ARMATEURS GROUP
Recovery and replacement of damaged Ace cable in Accra. Laying and post-wiring of 5 km of fiber optic cable
Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water
Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable
Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable
Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable
1 x Direct landing in Marseille, installation of shells, post-sinking, installation of posidonia anchors. Installation of grounding system
Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable
Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.

Contact us to find out more!