2014 GÉOCEAN BÉNIN
Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
A SUBSIDIARY OF THE LD ARMATEURS GROUP
Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.
Post Lay Inspection and Burial of 111 infield power cables
Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
Provison of burial services for 4 power and FO cables and 6 umbilicals.
Post Lay Inspection and Burial of 32 infield power cables.
Post Lay Inspection and Burial of 51 infield power cables.
Provision of submarine power cable repair assistance.

Contact us to find out more!