2013 VISCAS SIR BANYAS
Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
A SUBSIDIARY OF THE LD ARMATEURS GROUP
Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.
Provison of burial services for 4 power and FO cables and 6 umbilicals.
FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
2 direct FO shore-ends in Dakar (Senegal). Protection of cable (burial, articulated pipes, grout bags)
Post Lay Inspection and Burial of 51 infield power cables.
FO cable shore ends, PLIB and installation of articulated pipes.
FO cable shore ends, PLIB and installation of articulated pipes.
Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
FO cable shore ends – Post lay burial

Contact us to find out more!