2015 QUIBERON BELLE ISLE 4
Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
A SUBSIDIARY OF THE LD ARMATEURS GROUP
Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.
Performance of trenching trials for the construction works of the French offshore windfarms.
Laying of 43 km of power cable between mainland / platforms and platforms.
Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.
Post Lay Inspection and Burial of 111 infield power cables
Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)