Our projects

OUR REFERENCES IN SUBMARINE CABLES INSTALLATION

Download Track Record

2018 INDIGO  

Post lay inspection and burial of 39 km of fibre optic cable.

Burial system : ROVJET 605 (jetting)

2018 ASC Indonesia  

Post lay inspection and burial of 41 km of fibre optic cable.

Burial system : ROVJET 605 (jetting)

2018 TRIANEL BORKUM II OWF  

Provision of personnel and equipment to carry out the post lay burial of 18 infield power cables.

Burial system : ROVJET 1210 (jetting)

2018 IFA 2000 CABLES REPAIR  

Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.

Burial system : ROVJET 605 (jetting) + Massflow

2018 ASC Perth  

1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.

Burial system : TO Mobile (jetting)

2018 MERKUR OWF  

Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.

Burial system : ROVJET 1210 (jetting)

2017 BEATRICE OWF  

Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.

Burial system : ROVJET 1210 (jetting)

2017 SAFANIYA 5  

Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.

Burial system : TM03 (trencher)

2017 LTAII  

Provision of personnel and equipment to carry out trebsching services on a total of 10 submarine power cables.

Burial system : TM03 + TM04 (trenchers)

2017 QUINTILLION ALASKA  

1 separate shore end. 16 km cable installation with laying and burial.

Burial system : ESV12 (vibrating plough)

2017 IFA 2000 CABLES REPAIR  

Repair of 4 power cables being part of the IFA 2000 link .

Burial system : MED 1 (Dredge pump) + ROVJET806 (jetting)

2016 VEJA MATE  

Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.

Burial system : ROVJET 810 (jetting)

2016 NORDSEE ONE  

Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.

Burial system : ROVJET 810 (jetting)

2016 AL NASR QAFFAY  

Cable laying and burial between mainland and Qaffay Island.

Burial system : TM04 (trenching)

2016 MARJAN GOSP  

Provision of personnel and equipment to carry out the post-lay burial of one 115 kV power cable.

Burial system : TM03 (trenching)

2016 FITZROY Darwin  

1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.

Burial system : TO Mobile (jetting)

2016 BBG FUJAIRAH  

1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes)

Burial system : EBJ (jetting)

2015 SEA LION Rostock  

1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.

Burial system : ROVJET404 + EBJ (jetting)

2015 MANIFA  

Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.

Burial system : TM03 (trencher)

2015 ILE D’YEU  

Surface laying of 2 sections of power cable YEU3 and YEU4.

Burial system : N.A.

2015 FITZROY Port Hedland  

2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.

Burial system : TM04 (trenching) + EBJ (jetting)

2015 ABU ALI  

Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.

Burial system : TM03 (trenching)

2015 BALTIC 2  

Provision of personnel and equipment to carry out the post burial of 75 infield power cables.

Burial system : ROVJET806 (jetting)

2015 AMRUMBANK  

Provision of personnel and equipment to carry out the post burial of 86 infield power cables.

Burial system : ROVJET810 (jetting)

2015 QUIBERON BELLE ISLE 4  

Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.

Burial system : N.A.

2015 WASIT  

Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.

Burial system : TM04 (trenching)

2014 BUTENDIEK  

Provision of personnel and equipment to carry out the post burial of 86 infield power cables.

Burial system : ROVJET806 (jetting)

2014 WINTERSHALL  

Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.

Burial system : ROVJET806 (jetting)

2014 SAFANIYA 2  

Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.

Burial system : TM03 (trenching)

2014 EMF Trials in situ  

Performance of trenching trials for the construction works of the French offshore windfarms.

Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)

2014 PERENCO RDC CONGO  

Laying of 43 km of power cable between mainland / platforms and platforms.

Burial system : ROVJET806 + EBJ (jetting)

2014 GÉOCEAN BÉNIN  

Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.

Burial system : EBJ (jetting)

2013 AMX COLOMBIA  

2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.

Burial system : EBJ (jetting)

2013 LONDON ARRAY  

Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.

Burial system : ROVJET605 (jetting)

2013 ANHOLT  

Post Lay Inspection and Burial of 111 infield power cables

Burial system : ROVJET806 (jetting)

2013 VISCAS SIR BANYAS  

Lay and burial of 2x13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)

Burial system : TM04 (trencher)

2012 THORNTON BANK  

Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.

Burial system : ROVJET605 + ROVJET806 (jetting)

2012 CAT – THAÏLAND  

2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.

Burial system : EBJ 04 + ESV12 (jetting)

2012 PAIMPOL BRÉHAT  

Main DC power cable installation between mainland and 15 km offshore as part of EDF's tidal generation project.

Burial system : TM03 (trencher)

2011 KASHAGAN  

Provison of burial services for 4 power and FO cables and 6 umbilicals.

Burial system : TM03 (Trencher) + ESV12 (Plough)

2011 WACS  

FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS

Burial system : TJV05 - EBJ (jetting) - ROS (mattresses)

2011 ORMONDE WINDFARM  

Post Lay Inspection and Burial of 32 infield power cables.

Burial system : ROVJET605 (jetting)

2011 ACE – SENEGAL  

2 direct FO shore-ends in Dakar (Senegal). Protection of cable (burial, articulated pipes, grout bags)

Burial system : EBJ (Jetting)

2011 WALNEY 2  

Post Lay Inspection and Burial of 51 infield power cables.

Burial system : ROVJET605 (jetting)

2011 DELMA REPAIR  

Provision of submarine power cable repair assistance.

Burial system : Dredge pump (with divers)

2011 WALNEY 1  

Post Lay Inspection and Burial of infield power cables

Burial system : ROVJET605 (jetting)

2010 HONOTUA  

FO cable shore ends, PLIB and installation of articulated pipes.

Burial system : Dredge pump (with divers)

2010 MANIFA  

Provison of technical and engineering services / Cable laying and trenching services.

Burial system : TM04 (Trencher)

2009 IMEWE/MENA/TEN/EIG  

FO cable shore ends, PLIB and installation of articulated pipes.

Burial system : TO Mobile

2009 KASHAGAN  

Provison of burial services for 1 power cable and 2 umbilicals.

Burial system : TM03 (Trencher)

2008 PERENCO RDC  

Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.

Burial system : EBJ 04 (jetting)

2008 PERENCO – CAMEROON  

Barge operating for pipe laying

Burial system : N.A.

2008 KASHAGAN  

Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)

Burial system : TM03 (Trencher) + ESV12 (Plough)

2008 TAURT FIELD DEVELOPMENT  

Post trenching of subsea umbilical / PLIB

Burial system : ROVJET401 (Jetting)

2008 DELMA  

Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.

Burial system : TM04 (Trencher)

2007 ATLAS OFFSHORE  

FO cable shore ends - Post lay burial

Burial system : EBJ 04 (jetting)

2007 PICOT / GONDWANA  

FO cable shore ends - Post lay burial

Burial system : EBJ 04 (jetting)

2006 THAILAND KHO SAMUI  

Shore ends/Mainland to island/Laying and burial of 115 kV power cable

Burial system : TJV05 - TJV08 (Jetting)

2006 JAKASUSI  

FO cable shore ends / Laying and burial

Burial system : EBJ 04 (jetting)

2005 ORASCOM MED CABLE  

MED CABLE direct shore ends (FO)

Burial system : TJV07 (Jetting)

2005 SEA-ME-WE 4  

Direct shore ends / Laying and burial of FO cable

Burial system : Dredge pump (with divers)

2005 FALCON  

Separate shore ends / Laying and burial of FO cable

Burial system : TJV05 - EBJ03 (Jetting)

2005 PERENCO Gabon  

Mainland to platforms. Surface lay + J-tube Pull-In

Burial system : N.A.

2004 SIR BANIYAS  

Lay and burial of 2x9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)

Burial system : TM03 (Trencher)

2004 SIMIAN SAPHIRE  

Provision of nearshore trenching services.

Burial system : TJV06 (Jetting)

2003 AL KHAFJI  

Laying and burial of 40 km of power cable in Saudi Arabia.

Burial system : TM02 (Trencher)

2003 IFA 2000 – CABLE 11 REPAIR  

500 MW HVDC Power cable repair.

Burial system : MED1 (Dredge pump)

2003 ILE D’YEU  

Mainland to island / Shore ends / Laying and burial of 20 kV pc

Burial system : N.A.

2002 FLAG SOUTH PLIB  

PLIB works on telecommunication fibre optic cable.

Burial system : MED1 (Dredge pump)

2001 CROSSING TAT 14  

PLIB works on telecom FO cable crossings with RTE / NGC power cables

Burial system : MED1 (Dredge pump)

2001 I 2 I / Shore end MADRAS  

Cable lay and burial - 8 km CHENNAI shore end.

Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)

2001 ANTARES  

Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).

Burial system : N.A.

2001 ULYSSE  

Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).

Burial system : MED1 (Dredge pump) - ESV12 (Plough)

2001 SAT 3  

DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable

Burial system : TJV05 - TJV04 (Jetting) + ESV12 (Plough)

2001 APOLLO UK SHORE END  

Cable lay and burial BUDE shore end (UK).

Burial system : TJV04 (Jetting)

2000 VNF LILLE  

Along river - canal / 1 telecommunication fibre optic cable.

Burial system : Machine LD CABLE : Towed plough

2000 PEC / LEVEL 3/ FLUTE  

PLIB works on telecom fibre optic cable crossings.

Burial system : MED 1: Dredge pump / jetting tool

2000 Dumpton Gap – Level 3  

Remedial work : Lay and simultaneous burial of fibre optic cable.

Burial system : ESV11 (Plough)

2000 FLAG ATLANTIC 1  

3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.

Burial system : MED1 (Jetting) and ESV11 (Plough)

1999 ELGIN FRANKLIN  

Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.

Burial system : CASTOR 2 (Trencher)

1999 CIRCE  

Cable deburial / reburial and cable loop burial on CIRCE fibre optic cable system.

Burial system : MED1 (Dredge pump) - CASTOR (Trencher)

1998-1999 VNF PARIS  

Along river / Laying and burial of 3 multiple FO cables laid in one go

Burial system : ESV 07 / ESV11 (Plough)

1999 DCN TOULON  

Power and composite cables inside miltary harbour.

Burial system : N.A.

1998 BELIZE  

Main land to island / 34.5 kV power extension.

Burial system : TJV04 (Jetting)

1998 VNF SUD FRANCE  

Along river - canal / Dual fibre optic cable.

Burial system : EBJ 02 (jetting)

1997 SOUTH KOREA  

Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable

Burial system : COPS (mattresses protection)

1996 THAILANDE  

Mainland to KO SAMUI Island /Laying and burial of 115 kV power cable

Burial system : TM02 (Trencher) - TJV04 (Jetting)

1996 THAILANDE  

KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable

Burial system : TM02 (Trencher) – TJV04 (Jetting)