2018 INDIGO
Post lay inspection and burial of 39 km of fibre optic cable.
A SUBSIDIARY OF THE LD ARMATEURS GROUP
Post lay inspection and burial of 39 km of fibre optic cable.
Post lay inspection and burial of 41 km of fibre optic cable.
1 separate shore end. 10 km cable installation with laying and burial. Installation of articulated pipes.
1 separate shore end. 16 km cable installation with laying and burial.
1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.
1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes)
1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.