Our projects

OUR REFERENCES IN SUBMARINE CABLES INSTALLATION

Download Track Record
Found 100 Results
Page 7 of 9

2005 SEA-ME-WE 4

Direct shore ends / Laying and burial of FO cable

Burial system : Dredge pump (with divers)

Plus d'infos

2005 FALCON

Separate shore ends / Laying and burial of FO cable

Burial system : TJV05 - EBJ03 (Jetting)

Plus d'infos

2005 PERENCO Gabon

Mainland to platforms. Surface lay + J-tube Pull-In

Burial system : N.A.

Plus d'infos

2004 SIR BANIYAS

Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)

Burial system : TM03 (Trencher)

Plus d'infos

2004 SIMIAN SAPHIRE

Provision of nearshore trenching services.

Burial system : TJV06 (Jetting)

Plus d'infos

2003 IFA 2000 – CABLE 11 REPAIR

500 MW HVDC Power cable repair.

Burial system : MED1 (Dredge pump)

Plus d'infos

2003 AL KHAFJI

Laying and burial of 40 km of power cable in Saudi Arabia.

Burial system : TM02 (Trencher)

Plus d'infos

2003 ILE D’YEU

Mainland to island / Shore ends / Laying and burial of 20 kV pc

Burial system : N.A.

Plus d'infos

2002 FLAG SOUTH PLIB

PLIB works on telecommunication fibre optic cable.

Burial system : MED1 (Dredge pump)

Plus d'infos

2001 CROSSING TAT 14

PLIB works on telecom FO cable crossings with RTE / NGC power cables

Burial system : MED1 (Dredge pump)

Plus d'infos

2001 I 2 I / Shore end MADRAS

Cable lay and burial – 8 km CHENNAI shore end.

Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)

Plus d'infos

2001 ANTARES

Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).

Burial system : N.A.

Plus d'infos
Page 7 of 9
SCROLL UP